Thanks to our patented technology, we guarantee that no products in the box will be damaged, resulting in a return on investment within 4 to 18 months.

85+

€2.3 million in savings over 15 years

85% savings

85% savings

An ALS customer is using the BOS system with full-cut.

  • The annual cost of financing and maintaining the system is €27,500
  • that is roughly equivalent to the personnel costs for one person
  • In fact, the system performs about five times the amount of work that human labor would
  • Savings in single-shift operation: 85% or €2.3 million over 15 years
91+

€4.9 million in savings over 15 years

91% savings

91% savings

An ALS customer uses the WIM system for window cutting.

  • The annual cost of financing and maintaining the system is €31,000
  • that is roughly equivalent to the personnel costs for one person
  • In fact, the system performs about five times the amount of work that human labor would
  • Savings in a two-shift operation: 91% or €4.9 million over 15 years
  • The additional annual savings on unsold merchandise amount to approximately €4 million.

Case Study 1:
An ALS customer is using the BOS system with full-length cuts.

      • The annual cost of financing and maintaining the system is €27,500
      • that is roughly equivalent to the personnel costs for one person
      • In fact, the system performs about five times the amount of work that human labor would
      • Savings in single-shift operation: 85% or €2.3 million over 15 years

Practical Example 2:
An ALS customer uses the WIM system for window cutting.

      • The annual cost of financing and maintaining the system is €31,000
      • that is roughly equivalent to the personnel costs for one person
      • In fact, the system performs about five times the amount of work that human labor would
      • Savings in a two-shift operation: 91% or €4.9 million over 15 years
      • The additional annual savings on unsold merchandise amount to approximately €4 million.
Download overview

BOS Case Study

Reference Report BOS Box Opener Bosch Siemens

WIM Case Study

Customer Testimonial: WIM Package Opener for Hermes

Satisfied customers

Warehouse Logistics References
Back to Top
The product has been added to your cart

Vielen Dank für Ihre Anfrage!

Wir haben Ihre Nachricht erhalten und melden uns in Kürze bei Ihnen.
Eine Bestätigung wurde an Ihre E-Mail-Adresse gesendet.